On February 12, local time, Poland's power grid company announced a temporary disconnection of the Poland-Sweden power grid due to a fault. According to Jin10, the company emphasized that there are no indications that the outage was caused by human intervention. The fault in the connection with Sweden will not affect the system's safety, and preparations are underway to repair the damaged components. The Poland-Sweden undersea transmission line, operational since 2000, has become one of the most crucial energy connections in the region.
